3565 SF, 4 BR, 3 1/2 Bath, with MIL suite
Ty & Brandi conducting their job audit. Every plumbing, electrical, heating and cooling devices must be accounted for and photographed before closing up the walls.
Brushing in a non skid texture.
Wraping the pilings to prevent concrete adhesion.
Form stake mass production.
Planning the foundation layout and form work.
Building the rear deck.
Setting the LVL (laminated veneer lumber) beams.
Piling holes are bored with an auger bit. Ground guides are placed over the holes to ensure precise placement of the concrete pilings.
Les White, Acorn Construction General Contractor, #RG0055853
Copyright © 2024 Acorn Construction