Jacob working on the stair railing. We use KDAT (kiln dried after treating) for superior finish and stain adhesion.
Justin working on his privacy fence. Good to have a fall back skill in case everyone stops using cable.
Ethan and Serina painting their privacy fence. This is what happens when school is out and you don't have enough homework to do.
Les and Joel working out the geometry for the front porch brackets
Ty and Ken installing the range hood blower.
Installing the limestone pavers on the pool.
Cutting the limestone pool pavers.
Jason and Joel doing an outstanding job on the siding.
The green zip board has an impregnated water resistant coating that protects the wall sheathing and helps create an air tight thermal envelope for greater energy efficiency and interior comfort. Learn more at Zip Systems.
Pouring the foundation footings.
Getting started digging the footings.
Les White, Acorn Construction General Contractor, #RG0055853
Copyright © 2024 Acorn Construction