Game room bath
Hall bathroom
Stan working on the exterior stairs.
Robert's crew hard at it.
Front staircase roughed in. Zip board high performance sheathing installed.
JP is king of the hill today. We're using zip board wall sheathing with all joints seal taped to create a high performance air tight thermal envelope.
Setting the second floor trusses.
The bottom half of the ground floor garage is concrete block up to 9.5' above sea level to handle potential flood waters from the Bay with minimal damage.
Setting a garage door header.
Robbie and JP planning their next move.