Gallery Of Homes: Spear

Spear residence by Acorn Fine Homes Spear residence in Pensacola by Acorn Fine Homes Spear residence in Pensacola by Acorn Fine Homes Spear residence in Pensacola by Acorn Fine Homes Spear residence in Pensacola by Acorn Fine Homes Spear residence in Pensacola by Acorn Fine Homes Spear residence in Pensacola by Acorn Fine Homes Spear residence in Pensacola by Acorn Fine Homes Spear residence in Pensacola by Acorn Fine Homes Spear residence in Pensacola by Acorn Fine Homes Spear residence in Pensacola by Acorn Fine Homes Spear residence in Pensacola by Acorn Fine Homes Spear residence in Pensacola by Acorn Fine Homes Spear residence in Pensacola by Acorn Fine Homes Spear residence in Pensacola by Acorn Fine Homes Spear residence in Pensacola by Acorn Fine Homes Spear residence in Pensacola by Acorn Fine Homes Spear residence in Pensacola by Acorn Fine Homes Spear residence in Pensacola by Acorn Fine Homes Spear residence in Pensacola by Acorn Fine Homes Spear residence in Pensacola by Acorn Fine Homes Spear residence in Pensacola by Acorn Fine Homes Spear residence in Pensacola by Acorn Fine Homes Spear residence in Pensacola by Acorn Fine Homes Spear residence in Pensacola by Acorn Fine Homes Spear residence in Pensacola by Acorn Fine Homes Spear residence in Pensacola by Acorn Fine Homes Spear residence in Pensacola by Acorn Fine Homes Spear residence in Pensacola by Acorn Fine Homes Spear residence in Pensacola by Acorn Fine Homes Spear residence in Pensacola by Acorn Fine Homes Spear residence in Pensacola by Acorn Fine Homes Spear residence in Pensacola by Acorn Fine Homes Spear residence in Pensacola by Acorn Fine Homes Spear residence in Pensacola by Acorn Fine Homes Spear residence in Pensacola by Acorn Fine Homes Spear residence in Pensacola by Acorn Fine Homes Installing aluminum railing Installing aluminum railing for Acorn Construction Aluminum railing on Spear job Cutting concrete control joints in the Spear driveway Spear tile shower installing travertine Spear stucco columns Dormers on Spear job Spear residence in Macky Bluffs Laying brick up three stories on the Spear job Laying brick Cutting Brick Spear home in Pensacola Spear residence in Pensacola Installing shingles on the Spear job Spear new home in pensacola sealoflex porch coating Spear home in Pensacola rigging roof trusses setting trusses on the Spear job in Pensacola installing roof trusses in Pensacola installing roof trusses in Pensacola installing roof trusses setting trusses man lift framing a second floor wall in Pensacola insulating a window header insulated header raising garage wall setting garage wall glueing floor decking floor decking finished basement cutting rebar pouring the safe room vibratory screed anchor bolts bull float rotary trowell broom finishing the porch retaining wall footings vibratory roller laying CMU block drilling concrete for steel dowels basement wall drains basement wall drains pouring concrete with a boom pump concrete boom pump placeing concrete form work window bucks steel spacers plumbing the forms aluminum concrete forms tieing off steel setting steel pouring the basement footings pouring the basement footings pouring the footings planning the job basement footings breaking ground on the Spear residence in Pensacola Spear kitchen by Acorn Construction













Wolf range, hood, and warming drawer.

Wolf range, hood, warming drawer, and microwave drawer.

Wolf wine cooler, ice maker, and Miele coffee maker.





Master BR sitting space.


Limestone tub platform and vanity tops.


Travertine shower walls.




Stainless steel wire rope railing is used to open up the view.








Gerry drills brackets for the retaining wall guard railing.

Jasper cuts the bottom rails for the retaining wall guard railing.

Powder coated aluminum railing around the driveway retaining wall.

Les cuts control joints into the driveway with a diamond blade saw.  Sometimes the boss has to pitch in and actually it's more fun than sitting behind a computer screen all day.  Concrete shrinks as it cures so it will crack in random places.  By cutting 1" deep joints we can direct where the concrete will crack to relieve stress.  120sf per segment is a good rule of thumb for laying out control joints.

Mike and David set the chipped tile border in the master shower.  The travertine walls are made from 18"x36" pieces which have to be precisely laid.  The red substance on the walls is a sealant which prevents moisture from penetrating the joints in the cement board substrate..

David Mills installs travertine in the kitchen.  He's using a rubber mallet to carefully tap the tiles down into alignment to create a smooth surface and to make sure the mud bed is solid.  Tapping in the tiles also tests for weakness by causing tiles with hidden faults to crack during installation instead of after the owners move in.  It takes a lot of extra time and patience to properly install travertine to achieve tight joints, level surface, and minimum lipage.

Chris touches up the top of the stucco entry columns.

I added a pair of copper finials to give it a classic touch.

We're just about complete with the brick.  Now we're working on the stucco accent arch trims over the windows.

Those are some tallll walls.

Steel lintels are used to support brick laid over roof areas.

A diamond blade saw is used to cut brick.

Colored mortar was used to compliment the brick.

Stucco finish and vinyl soffit and facia has been applied before the shingles are installed so there will be no workmen on the roof to damage the shingles.

Bradley and his helper install singles over the garage.  Each shingles is nailed with 6 nails to comply with wind code.  The peal and seal 50 mil subroof protects the interior if a single should be damaged during a hurricane.

The wall and dormer flashing has been installed and duorock stucco board has been screwed to the walls that get stuccoed.

William applies the pink sealoflex coating over the fabric reinforcement cloth along the deck edges while Darin applies filler to the surface imperfections.  This is the first step in the process towards creating a waterproof elevated porch deck that will won't leak.

The green Zip system coated wall sheathing with zip tape provides an air tight thermal envelope.  The black peal and seal subroof protects the home from water damage should a hurricane damage or blow off some shingles.

James holds the tag line to control the truss as it's lifted and swung into place on the second floor.

Dean, Josh, and Jessie reaching for a truss.

Brandon, Dean, and Josh nail off a second floor truss.

Dean reaches for a spacer block that Red has pitched up to him.

Jessie nails off a spacer block to hold the trusses in proper alignment until the roof decking is installed.

Brandon, Dean, and Josh waiting on the next truss.  From the looks of it, you'd think there was a net down below.  Nope.  They're invincible.

The job called for a heavy duty, long reach, lull.  We had to get Robbie up to the second floor somehow.

Lifting a second floor wall.

Joe and Kenny insulate one of the headers.  This is a space that is typically left uninsulated in conventional framing practices.  High performance home construction demands that attention be paid to insulating every possible space.

Joe & Kenny install the inside piece of the header.  You can see how it would be impossible to insulate this header once it has been built.  A typical home will have 2 rolls of uninsulated spaces like this.  Imagine removing 2 rolls of insulation from your home.  Your heating and cooling bills are going to go up.

Dave, Kenny, Brian , & Jesse stand up the first wall.

Robbie uses a lever to lift up the wall over and set it down over an anchor bolt.  Remember fulcrums and levers from high school physics?  This is where it comes in handy.  You can see Kenny in the previous photo struggling to lift the wall over an anchor bolt.  This method is way better.

Brian applies glue to the deck joists and the tongue on the plywood to form a solid bond for the back porch floor decking.

Kenny drives the plywood tongue into the groove with a sledge hammer while Jessie nails it off.  We use ring shank nails and glue on the decking to create the most strength.

Finished basement with concrete cast in place walls.

Roy cuts out a protruding rebar.  The slab had a wild hair.

Gomez pours the roof on the safe room.  The safe room is engineered to withstand 250 mph winds and 100 mph missile impacts.  It will have a steel armored door with 3 deadbolts.  In this case the safe room will also serve as a bathroom in the basement.  You can also use it to store valuables and as a panic room.

Junior operates the vibratory screed to consolidate and smooth out the concrete.

Mike sets the anchor bolts.  This is how the walls will be bolted to the slab.

Roy bull floats the wet concrete to push down the rocks and bring more cement to the top to create a hard surface.  I use 3000 psi concrete for the slab which has a higher cement content and produces a harder surface.

Roy operates the rotary trowel machine which puts the final finish on the slab.  Look how high the first floor slab is compared to the roof on the house behind it.  The Spears are going to have quite a view of the bay.  I'm going to start referring to myself as a luxury bird house builder.

A horse hair broom is used to put a slightly grooved finish on the porch so that tile will adhere properly to the concrete surface.

Junior digs the retaining wall footings while Gomez checks the depth with his laser target rod.

A vibratory roller attached to a tracked skid steer is used to compress the clay fill dirt in the garage.  We achieved 99% compaction density with this equipment.

Joe lays up block on the front section of the foundation.  The lower block is 12" then switches to 8" block so there's a ledge to lay the brick on.  Dirt will cover the brick ledge when the front yard is finish graded.  You can see the gray basement walls in the background.

Shawn drills holes in the basement wall where a block wall ties into it.  Steel rods (dowels) will be inserted into the holes and run into the block walls so that the block walls, when poured with concrete, make a solid structural tie into the basement walls.

Gravel is dumped into the lower level to be placed over the basement drain pipe which you can see run along the bottom of the basement walls.

Gomez and Marky place the gravel over the drain pipe.  Fabric will be placed over the gravel and then the hole will be back filled and tamped.  This wall drain will make sure no hydrostatic pressure builds up on the basement walls and causes water intrusion.  The walls have been coated with a grey epoxy sealant to prevent moisture intrusion.

Roy signals the boom operator to move the hose forward as he directs the flow of concrete into the wall forms.

A boom pump is used to deliver the concrete to where it's needed.  The gray coating on the walls is a water proofing coating which prevents moisture intrusion in the basement walls.  This particular mix of concrete is 4000 psi and has chemical additives designed to allow it to flow around the steel inside the forms, self consolidate, and remain plastic or workable for an extended period of time thus allowing for a smooth finish on the walls with minimal honeycombing.

Roy on the hose filling the forms with concrete.

Kurt and Roy build window and door forms for the basement walls.

This is a wooden window form which will be sandwiched between the inner and outer form panels.  It has to be reinforced to withstand the weight of the wet concrete around it until it dries.  Then the wood will be removed leaving a window opening in the concrete.

Junior installs plastic spacers to keep the steel centered between the inner and outer form panels.

Gomez checks the basement wall forms for level and plumb.  You can see the layout strings crossing at head height.  These strings define the corner of the wall.

The aluminum forms are set for part of the basement walls.

Ron1 and Ron2 tie off the #5 steel rods to hold them in position during the pour.
The reinforcing steel has been erected in the basement and is ready for the wall forms to be set.

Pouring the footings along the back wall of the basement.

We used a 45 meter boom pump to place the concrete in the footing.  The boom operator in the foreground is using a remote control to maneuver the delivery hose into the proper position.  The wood boxes form the vertical hop ups in the footings as they climb out of the lower level and tie into the top level footings up slope where the front part of the house will be slab on grade.

We're coming around the south side of the basement.  You can see the footings stepping up the side of the hill to the right.  Footing hop ups are in the foreground.  The upper level footings will tie into these to connect the basement with the upper level slab on grade.

Gomez the foundation man, Ken the electrician, and Ed the plumber coordinate their plans to run pipes and electrical conduits through the foundation walls.

You can see the where the foundation footings for the basement section have been dug and the steel has been cut and laid in place.  The tall wood structures in the background are batter boards.  Strings are attached to them which outline the foundation and are set at the level of the first living floor.  These are the tallest batter boards I have ever built.  There aren't too many mountains in Pensacola.  This is one of them.

Breaking ground!  Digging the basement.

Why fly when you can ride?  Crows are the smartest birds, smarter than dogs actually.  They are omnivores, mate for life, nurture their young for 5 years, congregate in extended families, have a complex language, and are one of the only animals to use tools.  Chimpanzees and elephants use tools.  I use tools, too.  Hey, I'm as smart as a crow.  Most days anyways.

A trained golden eagle returns to his master in Mongolia.

Note the tall wine cooler in the corner and the microwave drawer.

Spear residence by Acorn Fine Homes - Thumb Pic 1
Spear residence in Pensacola by Acorn Fine Homes - Thumb Pic 2
Spear residence in Pensacola by Acorn Fine Homes - Thumb Pic 3
Spear residence in Pensacola by Acorn Fine Homes - Thumb Pic 4
Spear residence in Pensacola by Acorn Fine Homes - Thumb Pic 5
Spear residence in Pensacola by Acorn Fine Homes - Thumb Pic 6
Spear residence in Pensacola by Acorn Fine Homes - Thumb Pic 7
Spear residence in Pensacola by Acorn Fine Homes - Thumb Pic 8
Spear residence in Pensacola by Acorn Fine Homes - Thumb Pic 9
Spear residence in Pensacola by Acorn Fine Homes - Thumb Pic 10
Spear residence in Pensacola by Acorn Fine Homes - Thumb Pic 11
Spear residence in Pensacola by Acorn Fine Homes - Thumb Pic 12
Spear residence in Pensacola by Acorn Fine Homes - Thumb Pic 13
Spear residence in Pensacola by Acorn Fine Homes - Thumb Pic 14
Spear residence in Pensacola by Acorn Fine Homes - Thumb Pic 15
Spear residence in Pensacola by Acorn Fine Homes - Thumb Pic 16
Spear residence in Pensacola by Acorn Fine Homes - Thumb Pic 17
Spear residence in Pensacola by Acorn Fine Homes - Thumb Pic 18
Spear residence in Pensacola by Acorn Fine Homes - Thumb Pic 19
Spear residence in Pensacola by Acorn Fine Homes - Thumb Pic 20
Spear residence in Pensacola by Acorn Fine Homes - Thumb Pic 21
Spear residence in Pensacola by Acorn Fine Homes - Thumb Pic 22
Spear residence in Pensacola by Acorn Fine Homes - Thumb Pic 23
Spear residence in Pensacola by Acorn Fine Homes - Thumb Pic 24
Spear residence in Pensacola by Acorn Fine Homes - Thumb Pic 25
Spear residence in Pensacola by Acorn Fine Homes - Thumb Pic 26
Spear residence in Pensacola by Acorn Fine Homes - Thumb Pic 27
Spear residence in Pensacola by Acorn Fine Homes - Thumb Pic 28
Spear residence in Pensacola by Acorn Fine Homes - Thumb Pic 29
Spear residence in Pensacola by Acorn Fine Homes - Thumb Pic 30
Spear residence in Pensacola by Acorn Fine Homes - Thumb Pic 31
Spear residence in Pensacola by Acorn Fine Homes - Thumb Pic 32
Spear residence in Pensacola by Acorn Fine Homes - Thumb Pic 33
Spear residence in Pensacola by Acorn Fine Homes - Thumb Pic 34
Spear residence in Pensacola by Acorn Fine Homes - Thumb Pic 35
Spear residence in Pensacola by Acorn Fine Homes - Thumb Pic 36
Spear residence in Pensacola by Acorn Fine Homes - Thumb Pic 37
Installing aluminum railing - Thumb Pic 38
Installing aluminum railing for Acorn Construction - Thumb Pic 39
Aluminum railing on Spear job - Thumb Pic 40
Cutting concrete control joints in the Spear driveway - Thumb Pic 41
Spear tile shower - Thumb Pic 42
installing travertine - Thumb Pic 43
Spear stucco columns - Thumb Pic 44
Dormers on Spear job - Thumb Pic 45
Spear residence in Macky Bluffs - Thumb Pic 46
Laying brick up three stories on the Spear job - Thumb Pic 47
Laying brick - Thumb Pic 48
Cutting Brick - Thumb Pic 49
Spear home in Pensacola - Thumb Pic 50
Spear residence in Pensacola - Thumb Pic 51
Installing shingles on the Spear job - Thumb Pic 52
Spear new home in pensacola - Thumb Pic 53
sealoflex porch coating - Thumb Pic 54
Spear home in Pensacola - Thumb Pic 55
rigging roof trusses - Thumb Pic 56
setting trusses on the Spear job in Pensacola - Thumb Pic 57
installing roof trusses in Pensacola - Thumb Pic 58
installing roof trusses in Pensacola - Thumb Pic 59
installing roof trusses - Thumb Pic 60
setting trusses - Thumb Pic 61
man lift - Thumb Pic 62
framing a second floor wall in Pensacola - Thumb Pic 63
insulating a window header - Thumb Pic 64
insulated header - Thumb Pic 65
raising garage wall - Thumb Pic 66
setting garage wall - Thumb Pic 67
glueing floor decking - Thumb Pic 68
floor decking - Thumb Pic 69
finished basement - Thumb Pic 70
cutting rebar - Thumb Pic 71
pouring the safe room - Thumb Pic 72
vibratory screed - Thumb Pic 73
anchor bolts - Thumb Pic 74
bull float - Thumb Pic 75
rotary trowell - Thumb Pic 76
broom finishing the porch - Thumb Pic 77
retaining wall footings - Thumb Pic 78
vibratory roller - Thumb Pic 79
laying CMU block - Thumb Pic 80
drilling concrete for steel dowels - Thumb Pic 81
basement wall drains - Thumb Pic 82
basement wall drains - Thumb Pic 83
pouring concrete with a boom pump - Thumb Pic 84
concrete boom pump - Thumb Pic 85
placeing concrete - Thumb Pic 86
form work - Thumb Pic 87
window bucks - Thumb Pic 88
steel spacers - Thumb Pic 89
plumbing the forms - Thumb Pic 90
aluminum concrete forms - Thumb Pic 91
tieing off steel - Thumb Pic 92
setting steel - Thumb Pic 93
pouring the basement footings - Thumb Pic 94
pouring the basement footings - Thumb Pic 95
pouring the footings - Thumb Pic 96
planning the job - Thumb Pic 97
basement footings - Thumb Pic 98
breaking ground on the Spear residence in Pensacola - Thumb Pic 99
 - Thumb Pic 100
 - Thumb Pic 101
Spear kitchen by Acorn Construction - Thumb Pic 102

Spear Residence

Louis and Alexandra Spear had a set of plans from a another designer which I modified to better fit their lifestyle and capture the beauty of their lot.  The magnificent views from the second floor overlooking the bay demanded that the second floor rooms be rearranged and windows added to capture them to their best effect.

Les White, Acorn Construction General Contractor, #RG0055853
Copyright © 2024 Acorn Construction