Master bedroom
Master bath
Master shower
Laundry with 3 stage whole house water filter
Hall bath
Ty and Alan checking for movement while releasing tension on the chain fall after installing the X bracing.
Ty and Jacob installing stainless steel wire X bracing on the front porch pilings to improve lateral rigidity.
Luis setting the master shower tile.
Ken installing powder coated aluminum stair railing in the foyer.
Julio's gang pouring the driveway
Doves got to move in before the Moreland's did.
Jeff & Elanore Moreland
Vinyl soffit and porch ceilings being installed. Vinyl holds up better than painted hardi in these areas. Easier to keep clean and maintain.
Combinations of cementitious lap, board and batten, and shingle siding add interest and a modern flair to what would otherwise be a plain looking exterior appearance.
The green zip wall sheathing provides a solid secondary water resistive barrier and helps make the thermal envelope more air tight.
Pouring the garage and carport slab with a concrete pump truck.
Setting the roof trusses
Steve topping the pilings with Alan on the assist.
Getting started setting the pilings.
Les White, Acorn Construction General Contractor, #RG0055853