Current Projects:

May residence in Aragon, Pensacola May residence in Aragon, Pensacola May residence in Aragon, Pensacola May residence in Aragon, Pensacola May residence in Aragon, Pensacola May residence in Aragon, Pensacola May residence in Aragon, Pensacola

Arnold laying up the block walls.  Walls can only be laid up in 5' increments, then inspected, and poured solid with concrete.  We have only 2" clearance between adjacent homes.

Block and concrete walls going up.  We have 2" clearance between adjacent buildings on both sides.

Julio laying out the foundation.  You can see from the footings behind him we're kiss tight on the buildings left and right us.

French town classic town home style.
May residence in Aragon, Pensacola - Thumb Pic 1
May residence in Aragon, Pensacola - Thumb Pic 2
May residence in Aragon, Pensacola - Thumb Pic 3
May residence in Aragon, Pensacola - Thumb Pic 4
May residence in Aragon, Pensacola - Thumb Pic 5
May residence in Aragon, Pensacola - Thumb Pic 6
May residence in Aragon, Pensacola - Thumb Pic 7

Les White, Acorn Construction General Contractor, #RG0055853
Copyright © 2024 Acorn Construction